Search:

Prázdny
Prázdny

Sludge from chemical wastewater treatment plant

Prázdny
Prázdny

 

 

production

It is generated as a by-product in the process of coagulation and flocculation during chemical treatment of water with the average content of CaO 47% and moisture of 35%.

Fraction: sludge

Prázdny

use

In construction as an admixture to construction materials.

 

 

sales

Sales of sludge from chemical wastewater treatment plant is made through U. S. Steel Košice, s. r. o., GM Raw materials.

cONTAcT

Rudolf Juroš

Senior Manager Purchasing and By-product Sales

  +421 55 673 9551

  +421 917 656 608

Prázdny
Prázdny
Prázdny

We use cookies so that we can provide you with the best user experience possible. More info...